83 - All Decked Out - From Frame to Decking to Railings and Stairs

Lots to consider from frame to finish in terms of materials and connection to main structure. The boys agreed that--for bulk water management--attaching the deck ledger to the main structure should be done either for lateral stability only or with the ledger spaced out from the main structure.

Pete's Resource(s):

1. FPL Deck Guide: https://www.fpl.fs.usda.gov/documnts/pdf1997/falk97d.pdf (dated, yes, but seminal and it's written by an FPL great: BoB Falk)

2. AWC Residential Wood Deck Design - https://awc.org/wp-content/uploads/2021/12/StructureMag-DCA62012-StructuralSpecifications-1704.pdf

3. BSC Information Sheet 304 - Integrating Deck Ledger Board with Drainage Plane - https://buildingscience.com/documents/information-sheets/integrating-deck-ledger-board-with-drainage-plane

Previous
Previous

84 - Control layers on Trial

Next
Next

82 - Loads of Fun! That's Energy Loads in Homes